On the same map scale, the Suez Canal stretches much farther than the Panama Canal. But the shorter crossing asks a ship to do something the longer one does not: climb to a lake above the sea and descend again. The map shows distance; the profile shows the climb.
Suez is longer: about 120 miles (193.3 km) versus Panama’s 50 miles (80 km), according to the canal authorities. The lines between the map dots are shorter: 100.6 miles (161.9 km) for Suez and 47.3 miles (76.1 km) for Panama. Only Panama uses locks, lifting ships to a nominal lake level of 85 feet (26 m) above its local reference level.
How to use this article: Compare the two mapped lengths and their endpoints, trace the water levels along a transit, or see how each canal measures a ship’s width.
1. Compare terrain and endpoints
The two map lengths start at the marked northern endpoints
Both panels use the same distance scale and point north. Suez leads mainly south from the Mediterranean at Port Said, past Ismailia and through the Bitter Lakes, toward the northern Gulf of Suez. Panama bends southeast from the Caribbean approach near Colón. Its highlighted route crosses the hills of the isthmus through Gatún Lake and the Culebra Cut before reaching the Bay of Panama. A straight line between either pair of endpoints cuts across bends in the water route.

| What is measured | Suez | Panama |
|---|---|---|
| Selected mapped centerline, from dot to dot | 100.6 mi (161.9 km) | 47.3 mi (76.1 km) |
| Straight line between the same dots | 93.7 mi (150.8 km) | 39.6 mi (63.8 km) |
| Each authority’s published overview distance | About 120 mi (193.3 km) | About 50 mi (80 km) |
The first row adds the distances between neighboring vertices on one mapped centerline for each canal. Both sums use the same WGS 84 ellipsoid. In Suez, the dots are the near-shore Port Said approach and northern Gulf of Suez end of the chosen line. In Panama they mark the selected Atlantic and Pacific approach ends. They do not mark identical administrative limits or include every offshore approach. Divide the two centerline sums and the answer is about 2.1. Divide the separate authority figures and it is about 2.4. The ratios answer different length questions.
A channel’s start depends on what the measurement includes
The Suez Canal Authority lists its overall canal length separately from the definition of the canal proper in its 2020 rules. That definition has different northern starts for the west and east approaches. Panama’s authority describes its approximately 50-mile (80 km) figure as an ocean-to-ocean length. The figures are useful as broad operator summaries; they are not separate surveys of the same endpoints on the maps here.
2. Follow a lock transit and a sea-level transit
Panama’s high stretch is the water the ship floats on
Follow the original Panama route from the Atlantic side. The Gatún Locks raise the ship to the Gatún Lake level. The ship stays up through the lake and the excavated Culebra Cut, then drops at Pedro Miguel to the lower Miraflores Lake. The Miraflores Locks complete the descent toward the Pacific. The authority’s design profile places the two inland surfaces near 85 and 54 feet (26 and 16.5 m) above the local zero reference, called Precise Level Datum (PLD). The steps are not hills, and the top of the high line is not the height of the land around the canal.

In Suez, a vessel goes from the Mediterranean to the Gulf of Suez through cut channels and lake passages without a lock lift. No equivalent high lake divides the approaches. Its working surface still rises and falls: the Suez Canal Authority gives extreme tidal ranges of about 2.1 feet (0.65 m) at the north end and 6.2 feet (1.9 m) at the south. Those are ranges, not the height difference between the two seas. The profile marks a sea-level design baseline, not a surveyed line across Egypt that shares Panama’s vertical datum.
3. Compare dimensions using the same vessel measure
Compare how wide the ship is, not how wide the water looks
Pick one measurement before comparing the passages: beam, the width of the ship. Panama’s 2026 vessel notice gives 168.14 feet (51.25 m) as the regular maximum beam for specified vessel classes using the Neopanamax locks. It measures the ship’s outer shell and relevant projections below lock-wall height. That limit describes the newer locks, not the original route drawn in the profile.
Suez’s 2020 rules give a general beam figure of 254 feet 3 inches (77.5 m), subject to conditions and exceptions. They look up beam alongside draft, the depth of the ship below its waterline, so the tables give several different combinations. This is not the same as putting Suez’s water-surface width next to a Panama ship width. The comparison shows what each system has to check about the hull; it does not establish that a vessel of a given width would be admitted to either canal.
Frequently Asked Questions
Does the difference in Suez lengths show how long the offshore approach is?
No. The authority’s overall figure exceeds this map’s line by about 19.5 miles (31.4 km). That is the difference between two measurements, not the length of a single missing approach: the map and the authority do not use the same endpoints, and the authority distinguishes western and eastern approaches.
Does the profile show the water depth under a ship?
No. Panama’s 85-foot (26 m) mark tells you where the lake surface sits relative to the canal’s local zero, not how far below it the bottom lies. Likewise, the flat line on the Suez chart shows that ships do not need a lock lift; it does not mean the channel has the same depth throughout.
What Did We Learn Today?
The same-scale map shows why Suez is the longer crossing. Panama’s profile shows why distance is only half the comparison: ships climb to Gatún Lake and descend again, while Suez connects the seas without a navigation lock. Keep the map endpoints, the water-level reference and the ship’s dimensions separate.
Sources & Data Notes
The original traces use named OpenStreetMap relation members and connected nodes. Panama is measured from 9.400412° N, 79.917997° W to 8.942850° N, 79.564696° W, through one lane in each original lock complex. Suez runs from 31.275712° N, 32.326332° E to 29.930335° N, 32.560698° E on one older main-line alignment. The plotted distance proceeds from those same marked north starts. The lines are geographic illustrations, not navigation charts; distances and nominal water levels are rounded. The profiles do not show live tides, lake readings, water depths or lock thresholds.
References and credits
- Panama Canal Authority: approximate ocean-to-ocean length and lock system; 2006 Master Plan, Appendix A, original lock and nominal lake profile; 2026 Vessel Requirements, section 2, Neopanamax beam and Annex 5 datum.
- Suez Canal Authority: overall lengths, sea-level design and tidal ranges, canal-proper definition, 2020 vessel rules and beam-versus-draft tables and Ismailia and canal stops.
- Original map and profiles by GeographyPin. The selected Panama and Suez lines, Gatún Lake and Lake Timsah use OpenStreetMap contributor data (ODbL); generalized coast and Bitter Lakes use public-domain Natural Earth. Download the map geometry (GeoJSON ZIP, ODbL).
Cover photograph: Mariordo (Mario Roberto Durán Ortiz), aerial view of Gatún Locks and Gatún Lake, March 25, 2014, CC BY-SA 3.0; cropped, resized and converted to WebP under the same license. The parallel expansion site was still under construction in this photograph.
