Skip to content
Explainers & Big Questions

Geoid and Ellipsoid Heights Using One Survey Point

Diagram of two different height measurements from the ellipsoid and a lower modeled reference to the same survey mark.

A survey mark in Colorado has two published heights that differ by nearly 17 meters. Both numbers refer to the same mark. The two heights use different zero surfaces.

How to use this article: Start by reading the survey record, work through the minus sign, or check the result against the published elevation.

1. Read the Two Heights on a Colorado Survey Mark

L 395 is a survey mark in El Paso County, Colorado. Its permanent identifier, JK0858, identifies the point in the U.S. National Geodetic Survey database. An archived November 7, 2012 datasheet reproduced by NGS records both its satellite-derived ellipsoid height and its adjusted elevation in the North American Vertical Datum of 1988 (NAVD 88). Use the three height entries below from that same record; this is not a statement about the mark’s current condition.

What to copy from the datasheet

Archived NGS values for L 395 (JK0858), in meters as published
EntryValueReference
Ellipsoid height (h)1,994.303 mNAD 83(2011), epoch 2010.00
Geoid separation (N)−16.77 mGEOID12A, historical model
Published orthometric height (H)2,011.084 mNAVD 88, adjusted

The survey record gives elevations to several decimal places, but that does not make every figure equally precise. Keep the displayed values for the calculation, then round the result to match what the inputs support. Here the separation is printed to the nearest centimeter.

2. Locate the Ellipsoid and the Geoid

The ellipsoid is a smooth, slightly flattened surface defined mathematically. The ellipsoid height is a geometric coordinate obtained by processing satellite positioning observations in a specified reference frame. It tells you how far the mark lies above or below that reference, not how high it is above the nearest shoreline.

The geoid follows Earth’s gravity field. It approximates the level the ocean would settle to without persistent currents and other effects and continues conceptually beneath the continents. It does not trace real mountains or local sea levels. An orthometric height is the gravity-related elevation of a point relative to a defined reference. GEOID12A is the historical hybrid model used in the archived example. Its separation was used to estimate a NAVD 88 elevation from a compatible NAD 83 ellipsoid height; GEOID12A is not the model to choose for new survey work.

At L 395, the negative separation places the model surface below the ellipsoid. Both heights start below the mark, but the one that starts lower must be larger.

At Colorado survey mark L 395, the modeled height reference lies below the ellipsoid, so the same point has a larger orthometric height.
One Colorado mark, two reference surfaces. The diagram uses the historical GEOID12A model from the November 7, 2012 NOAA datasheet: 2,011.073 m is the calculated estimate before rounding, and 2,011.084 m is the datasheet’s adjusted NAVD 88 height. GeographyPin illustration, not to scale. enlarge diagram.

3. Convert the Height at L 395

Subtract the signed value

NGS gives the relationship h = H + N. To solve for the orthometric height, subtract N from both sides. For this archived example, N is the historical GEOID12A separation from the November 7, 2012 datasheet. Keep its minus sign when you substitute:

  1. Set up: H = 1,994.303 m − (−16.77 m).
  2. Calculate: H = 1,994.303 m + 16.77 m = 2,011.073 m before rounding.
  3. Report: about 6,598 feet (2,011.07 meters) in NAVD 88 for this worked estimate.

Benchmark check: The 2,011.073 m estimate is 0.011 m below the archived adjusted NAVD 88 value of 2,011.084 m. This is the difference between the displayed numbers, not an accuracy claim.

If you drop the minus sign, you get 1,977.533 m instead. That is 33.54 m lower than the correct unrounded estimate, twice the size of the separation. The diagram gives a quick way to catch the error without a calculator: starting from the lower reference cannot produce the smaller height.

4. Check the Result and Change the Sign

Check against the recorded elevation

The benchmark check compares the calculated estimate with a separate adjusted entry on the datasheet. It is a useful way to check this calculation, not an independent validation of GEOID12A: NGS fits its hybrid models using satellite and leveling data at benchmarks, and the inputs are rounded.

For a second case, keep the same numerical ellipsoid height but imagine a different point with a compatible positive geoid separation, +16.77 m. This is a sign exercise, not a second reading at L 395. Then H = 1,994.303 m − (+16.77 m) ≈ 1,977.53 m. Here the reference surface is higher than the ellipsoid, so the height measured from it is smaller. The formula stayed the same; only the sign changed.

5. Match the Datums Before Comparing Elevations

Before comparing a receiver’s reading with a benchmark, check which height the receiver actually reports. If it already reports elevation in the benchmark’s vertical datum, subtracting a model separation again would apply the correction twice. If it reports ellipsoid height, identify its reference frame and choose a model that connects that frame to the benchmark’s vertical datum in your area.

  • “Ellipsoid height · NAD 83(2011)” (illustrative label): check the frame and epoch, then use a compatible model if you need a NAVD 88 height.
  • “Orthometric height · NAVD 88” (illustrative label): the height is already in the target datum. Do not subtract the separation again.

For L 395, the archived values specify NAD 83(2011) for the input and NAVD 88 for the result. Do not assume a value labeled WGS 84 can go straight into the same conversion, or that any reading labeled “mean sea level” necessarily means NAVD 88. Check the units, the model version, and whether you measured the actual mark rather than the receiver above it. For real survey work, use the relevant agency’s guidance and up-to-date control, not this archival exercise.

Frequently Asked Questions

Does a negative geoid separation mean the point is below sea level?

No. The sign describes the modeled reference surface relative to the ellipsoid, not the elevation of the ground. L 395 has a negative separation and a positive NAVD 88 elevation.

Can I use the same separation for every point in a county?

Not without checking. The model value varies by location. Read the model at each point when that variation could matter for the accuracy you need.

Does a new geoid model move a benchmark?

No. A new model can change the calculated height without moving the physical mark or changing what the old datasheet printed. An agency can also publish a revised height for the same mark without it having moved. To determine whether the marker itself moved, look for field observations or a current recovery record.

What Did We Learn Today?

Read the reference next to the number before reading it as an elevation. At L 395, subtracting a negative model value raises the numerical height and brings it close to the published benchmark elevation. The same calculation works with a positive separation, but only when the input frame and target datum match the model.

Sources & Data Notes

Open the archived datasheet and height-model references

The figures for JK0858 come from a November 7, 2012 NGS datasheet reproduced in an NGS presentation. GEOID12A is a superseded hybrid model, used here to reproduce the archive rather than recommend a current survey workflow. Metric inputs are transcribed as shown; feet are rounded. The positive-separation variant is explicitly fictional. Both instructional graphics are original GeographyPin illustrations based on the archived NGS values.

See something off?

Thanks for your feedback!
Share via
Copy link