Skip to content
Explainers & Big Questions

How Much of the Channel Tunnel Is Under the Sea?

Vehicle shuttle train emerging from the French end of the Channel Tunnel in 2014.


The Channel Tunnel is 31.3 miles (50.45 km) long from portal to portal. Its tunnel mouths sit inland, and the shuttle boarding platforms sit farther back still. The undersea stretch, the full tunnel and the shuttle journey are three different distances.

How to use this article: Start with the distinction between portals and platforms, compare the three crossing lengths, or see why the seabed matters when measuring depth.

1. Locate both portals

The tunnel mouths are not the boarding platforms

On the English side, the tunnel begins at Castle Hill, north of Folkestone, in Kent. The French mouth is at Beussingue near Sangatte, outside Calais. Beussingue is also spelled Bessinge on the joint British–French railway investigation diagram. In either direction, the portals are where the railway enters or leaves the bored tunnel, not where it passes beneath the shoreline.

The shuttle platforms are separate. The terminal near Folkestone is at Cheriton. The French terminal that LeShuttle calls “Calais” is at Coquelles. The train travels on open-air railway between the platform and the tunnel mouth at each end. A platform-to-platform measurement therefore includes more railway than a portal-to-portal measurement. Neither is the shortest coast-to-coast gap across the Strait of Dover.

2. Separate total and undersea length

The distance changes when you move either endpoint

Lengths on one scale: 23.5 miles beneath the Channel, 31.3 miles from tunnel portal to portal, and 36.3 miles from shuttle platform to platform.
Same scale, different endpoints: the Institution of Civil Engineers’ figures put about 75% of the bored crossing undersea. LeShuttle’s longer platform-to-platform distance includes railway outside the tunnel. Original graphic: GeographyPin. Enlarge diagramEnlarge diagram
Three measured lengths for a single crossing
What is countedLengthWhere it starts and ends
Full tunnel31.3 mi (50.45 km)Castle Hill portal to Beussingue portal, including the sections bored under land (ICE).
Undersea section23.5 mi (37.9 km)English shore to French shore, measured along the route, not straight across the water (ICE).
LeShuttle train journey36.3 mi (58.44 km)Folkestone terminal platform at Cheriton to Coquelles terminal platform (LeShuttle).

Divide 37.9 by 50.45 and the result is about 75%. Using that same pair of figures leaves roughly 7.8 miles (12.6 km) under land in total. Getlink’s infrastructure overview gives rounded figures of about 31 miles (50 km) for each tunnel and about 23 miles (37 km) beneath the sea. The summaries do not identify the exact shoreline points they use, so calculate the share from one source’s figures rather than combining the two.

Two rail tunnels do not double the distance to France

Each of the two rail bores carries a single track; a smaller service tunnel runs between them. One train crosses in one of the rail bores. Getlink reports about 62 miles (100 km) of installed track inside the tunnels because that inventory counts the railway in both running bores. It is not a second estimate of the distance a passenger travels, and it does not count the service tunnel as rail.

3. Follow the depth below the seafloor

Look at where the depth arrow starts

The train crosses in rock, not in a tube lying on the floor of the Channel. The bores follow a band of marly chalk where possible, so their height changes independently of the seabed. Water depth runs from the sea surface to the bed. Rock cover is the distance down from that bed to the tunnel. Depth below the sea surface includes the water above the bed as well.

A schematic cross-section shows rail beneath the English Channel seabed. At the lowest point, the Geological Society reports about 377 feet below the sea surface and about 246 feet of rock cover below the seabed.
At the same low point, one arrow starts at the sea surface and the other at the seabed. The profile shows the difference; neither the horizontal distances nor the vertical shape are drawn to scale. Source figures: Geological Society of London. Original graphic: GeographyPin. Enlarge diagramEnlarge diagram

The Geological Society puts that part of the tunnel about 377 feet (115 m) below the sea surface, with about 246 feet (75 m) of rock cover there. These numbers use different starting surfaces. The commonly reported 75 m is not the full surface-to-tunnel depth in that account. Getlink’s separate figure of about 131 feet (40 m) below the seabed is an average, not the maximum rock cover. Rounded engineering figures do not give a surveyed water depth or bed profile.

Frequently Asked Questions

What does the builder’s 93-mile tunnelling figure count?

That is about 93 miles of tunnelling across three parallel bores, including the service tunnel, in contractor VINCI’s project description. It is a combined construction length, not the railway distance from Britain to France.

Why did a railway report give a length of 39 miles?

A 2016 British–French investigation calls the Folkestone–Coquelles railway line about 39 miles (63 km) long. It distinguishes that line from the shorter bored tunnel. It is a railway infrastructure figure, not the tunnel length or LeShuttle’s platform-to-platform distance.

What Did We Learn Today?

Use the two portals to measure the full tunnel, the two shorelines for the undersea section, and the two loading platforms for the LeShuttle journey. At the deepest part, depth below the sea surface is greater than depth below the seabed because it includes the water above the rock.

Sources & Data Notes

The undersea share uses the two metric lengths from the same source. Miles and feet are converted from those source figures. The bars start at a common zero for comparison, not at a common place. The depth profile is a schematic, not an engineering survey.

References and credits

Cover photograph: Florian Fèvre, Eurotunnel shuttle at the French end, August 20, 2014, for Mobilys, CC BY-SA 4.0; cropped, resized and converted to WebP under the same license.

See something off?

Thanks for your feedback!
Share via
Copy link